ARABIAN GULF INTEGRATION ROOM AGIR Meaning, in French, “to act”.
Displaying how to make a cohesive whole of the Arabian Gulf as a basin.
DRAFT PRICE LIST
1. Convex-Disc Ramp Stepdown, near Birecik, Turkey $300 MILLION
2. Wadi el Batin Cut-Through $800 MILLION (using aircraft)
3. Karun River Zig-Zags $1 BILLION (undershot waterwheels)
4. Nafuds cut with Multi-channel canals $300 MILLION
5. Sea-level Flushing, into UAE, or even to the Umm as Samim $1 BILLION
6. Offshore Biomass Rig: Gracilaria $100,000
7. Satellite assessment of marine bioproductivity using SeaWiFS data, through Global Feed $20,000
8. Cones, Cages and Wallows near Salt Pans (Sabkhas) $150,000
9. Flushing out Alluvial Fans at the Head of the Gulf Based on satellite assessment of Iraqi projects $2 BILLION
10. Convex-Disc Marsh Zig-Zag Strcture, for mountains $300,000
11. Wadi Yudayyah Hydrometric Area, site for projects Example: clearing the mouth to yield seagrass $20,000/month
12. Feather-Production Sequence, from urban wastes Example: keratin dispersion in swamps or oases $10,000/month
Dispersed throughout space. Undershot Waterwheels, to replace hydroelectric dams $20,000 per test
Inshore Biomass Rig: Microalgae $20,000
